What to Ask Officers During a Shift Schedule Pilot

A U.S. Army military police specialist gets into a patrol car at Fort Carson, Colorado.

A schedule pilot can fill every slot on paper and still create problems at the end of the workweek. To find out where the schedule is helping or hurting, ask officers about the shifts they actually worked, then compare their answers with roster and overtime records. Run the same short survey before the pilot and after employees have worked several full cycles.

TL;DR

Measure notice, extensions, recovery time, and shift handoffs separately. Compare the scheduled hours with actual hours, publish survey counts, and agree on the decision criteria before you start. Give employees on every affected shift a way to respond.

Decide what would make the pilot worth keeping

Start with the problem you want to solve. Is the agency trying to reduce forced holdovers, provide more weekend overlap, or make schedules easier to plan around? Pick the main objective and name the conditions that must not get worse. For example, a pilot designed to reduce last-minute extensions still needs to preserve minimum coverage and workable handoffs. Make the duration, affected groups, and decision date clear. Bring scheduling, payroll, operations, and employee representatives into the discussion where appropriate.

The NIJ-supported shift length experiment compared 8-, 10-, and 12-hour shifts in two police agencies. It examined several outcomes, including fatigue, alertness, overtime, and quality of work life. Use the study to decide what to measure, not to select a schedule for a different agency without testing it. Your rotation, overtime practices, and staffing needs may differ substantially from those in the study.

Ask questions tied to the schedule people worked

Use a clear reference period. “During your last four scheduled workweeks” is easier to answer than “usually.” If someone did not work a full cycle or was on leave for much of it, let them say so. Ask one question for each condition rather than combining them into a job-satisfaction score.

  1. Notice: How often did you know your start and end times at least seven days in advance?
  2. Extensions: How many shifts ended later than scheduled because you were required to stay? Use ranges that fit the expected volume and include zero.
  3. Recovery: How often did the time between scheduled work periods feel sufficient for you to come to work rested?
  4. Handoffs: How often did your shift have enough overlap to brief the incoming team on work that needed follow-up?
  5. Change request: Which one scheduling issue should we address first? Offer choices such as late notice, holdovers, uneven weekends, limited swap options, or another issue.

For frequency questions, label the options clearly, such as Never, Rarely, Sometimes, Often, and Always. Add Not applicable as a separate choice. If you invite comments, ask for a process change and tell respondents to leave out names, case information, and personal medical details. Keep urgent fatigue and safety reporting on the agency’s established channels.

Compare survey results with actual hours

List how many staff were invited, how many answered, and the number who answered each item. Keep the data at the level needed for the decision. You probably need to know whether respondents worked the pilot roster; you do not need to ask for their employee number. When a shift is small, roll its results into a larger group rather than publishing a breakdown that colleagues can reverse-engineer.

Look at actual end times, total overtime hours, forced holdovers, and coverage gaps for the same period as the survey, using a consistent definition for each measure. An example: if the roster shows better handoff overlap and employees confirm it, keep that feature. If extensions are unchanged overall but employees say notice has worsened, look at when changes are announced. Those two findings can both be true. Before comparing rounds, check for disruptions such as a major event, unusual vacancies, or a large training block.

Tell staff what you are doing with the feedback

Make the update short enough to read at roll call. In a hypothetical pilot, operations might say: “Most respondents found the overlap useful. Late notice remained a problem. We will publish the roster earlier and run one more cycle before making a permanent decision.” State the decision owner and review date. If a constraint prevents a change, say what it is rather than asking the same question again without explaining why.

Use Officer Survey’s shift scheduling and work-life balance survey questions to choose items for your pilot. If you want help setting up the baseline and follow-up, request an Officer Survey demo.

Frequently asked questions

Should we ask which shift length officers prefer?

Yes, if it helps the decision. Put that item after the questions about actual experience so a preference does not replace the evidence on coverage, recovery, and predictability.

What if the survey and payroll records tell different stories?

Investigate the difference. Payroll can show how much overtime was paid, while the survey can show whether that time was predictable. Neither tells the whole story by itself.

Can a short pulse establish whether a schedule is safe?

No. A survey captures staff experience and can flag concerns. Safety review, fatigue procedures, staffing analysis, and applicable labor obligations still matter.